Step 1
Schedule
The week goes on the board, by site.
Step 2
Drill
Each hole is logged at the rig.
Step 3
Shoot
Loading and timing go on the blast report.
Step 4
Bill
The ticket is built from the shot's holes.
01 · Scheduling
The week, by site.
Crews and rigs go on one board, laid out by site. Publish it and everyone has the week: on their phone, and as a PDF in the company Slack.
- Crews and equipment on the same board
- Each person opens to their own days
- The published week goes out as a PDF
Published Friday 3:40 PM · 11 people
02 · Drill logs
Logged from the bench.
Drillers log each hole on a phone as it's drilled. The office watches the pattern fill in on a map, over the drone photo of the site.
- Pattern, depth and notes for every hole
- The map in 2D or 3D, over your own flight
- On the phone the driller already carries
- Drilled
- 54 of 72
- Today
- 8 holes
- Pattern
- 12 × 14
Last hole E-6 · 38 ft · 2:14 PM
03 · Blast reports
The shot, on the record.
Loading, timing and vibration for every shot, entered once in the field and printed as the report.
- Pounds per delay worked out from the tie-in
- Seismograph readings kept with the shot
- A reviewed report locks; a later edit takes a reason and is logged
- Holes
- 142
- Pattern
- 12 × 14 ft
- Depth
- 38 ft
- Volume
- 33,575 yd³
- Powder factor
- 1.05 lb/yd³
- Max per delay
- 248 lb
Seismograph · 640 ft
0.42 in/s peak
04 · Billing
Tickets ready to bill.
The field ticket is built from the shot's own holes, so the yards on the ticket are the yards that were drilled and shot.
- Every hole on the ticket
- Holes, depth, pattern and yards on the customer's copy
- Re-shot holes stay off the bill
| Item | Qty | Unit |
|---|---|---|
| Holes drilled and shot | 142 | ea |
| Depth | 38 | ft |
| Pattern | 12 × 14 | ft |
| Rock shot | 33,575 | yd³ |
12 × 14 × 38 ÷ 27 = 236.4 yd³ a hole × 142
Around the shot
The rest of the day
- Equipment
- Rigs and trucks with their service plans, and where each machine is working.
- Crew
- Per diem and reimbursements sent from the phone and reviewed by the office.
- Roles
- Each role sees what it needs. Pay stays with the people who handle pay.
- Trip manifests
- What's on the truck and where it's going, written before it leaves the magazine.
The figures in the examples on this page are made up to show the layout. They are worked the way the platform works them: 12 × 14 × 38 ÷ 27 is 236.4 cubic yards a hole.
Talk to us
Tell us how you run drilling and blasting today.
We'll walk you through the platform with your kind of work in mind.